Big Batches™ and assumptions
Big Batches™ embed:
- more assumptions
- way more second-order, compounded assumptions as a product of first order-assumptions (A x B x C x … x N)
- carry all of these for a longer time
Small Batches™ embed:
- less assumptions
- less second-order assumptions
- carry all of these for a shorter time
Which one of these is likely to have more waste compared to the amount of effort invested?
Or, to rephrase it, which one of these has a higher effort/value ratio?
Lose-lose-lose vs win-win-win if you ask me.